Goriziane’s engineers designed, manufactured and successfully accomplished the installation activities of a pipe handling and quadruple-joint pipe cutting and lighting plant at Burgas Port, in Bulgaria, for the TurkStream project. The plant aims at cutting, brushing, and re-bevel quadruple joint pipes turning them into joint pipes so that they can be loaded on the heavy lift construction vessel, which is equipped with a double joint factory.
#innovating together